Why the 2015 “Call for Projects” is Cause for Celebration

Early Chandler Cycletrack rendering

Early rendering of proposed cycle track on Chandler Blvd, one of 8 active transportation projects from the City of Los Angeles recommended for Metro 2015 Call for Projects funding.

On June 29th, Metro released its preliminary recommendations awarding grant funding to projects countywide under the 2015 Call for Projects program, a competitive application process that distributes capital transportation funds to regionally significant projects. By all accounts, this was a successful ‘Call’ year for the City of Los Angeles, in particular for people that walk and ride their bicycle. Eight projects that will improve active transportation were recommended for funding!

City projects set to receive funding, by ‘Call for Projects’ category, include:

1) Regional Surface Transportation Improvements

  • Complete Streets Project for Colorado Boulevard in Eagle Rock: Improve traffic flow and implement “Complete Streets” elements on Colorado Boulevard by installing signal improvements, turn lanes, median islands, bump-outs, and pedestrian lighting. (More information available here)
  • Harbor Boulevard /Sampson Way/7th Street Reconfiguration: Harbor Boulevard and Sampson Way realignment/intersection consolidation;widened sidewalks; Class II bike lanes.

2) Transportation Demand Management

  • Building Connectivity with Bicycle Friendly Business Districts: Create Bicycle Friendly Business Districts that coordinate with business districts to offer TDM incentives, develop an app, and provide amenities that encourage short trips by bicycle.

3) Bicycle Improvements

  • Chandler Cycle Track Gap Closure Project: Project will construct a 3.1 mile cycle track along Chandler Boulevard, connecting the Chandler and Orange Line Bike Paths, and bridging a gap in the low-stress bicycle network.
  • Mid-City Low Stress Bicycle Enhancement Corridors: The Project is a compilation of bicycle way-finding and traffic calming treatments along two neighborhood corridors in Mid-City area to support regional low-stress bicycle network. (More information available here, and here)

4) Pedestrian Improvements

  • Melrose Avenue-Fairfax Avenue to Highland Avenue Pedestrian Improvements: Strengthen first/last mile connectivity on Melrose Avenue through pedestrian/bike-friendly improvements to restore the avenue’s reputation as a retail and entertainment destination.
  • LANI – Santa Monica Boulevard Improvement Project: The project will implement a series of streetscape improvements on Santa Monica Boulevard designed to increase pedestrian safety, support multiple modes and promote transit use.
  • Beverly Boulevard, Vermont Avenue to Commonwealth Avenue Pedestrian Improvements: Design and construction of pedestrian improvements/streetscape enhancements. To provide linkages to major transit along Beverly Boulevard, Temple Street, Virgil Avenue and Silver Lake Boulevard.

Due to the Call funding cycles,  some of these projects are programmed for a few years down the line and will not be funded until as late as 2020. However, having all these active transportation projects recommended for funding are a cause for celebration and we can’t wait to implement these projects! Additional information about the details of these projects can be found in this list of applications the City recommended to submit for the 2015 Call for Projects process.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *